The Minister of Public Works and Planning, José Ballesta, and the mayor of Cehegín, Jose Soria, inaugurated the second leg of the Round the Old Town, which is already open to traffic and that "will output all the neighbors La Soledad and El Cubo ", as the latter.
With a total investment of 1,075,952 euros, financed by the Autonomous Community (75 percent) and by the session ceheginero (remainder), it has been completing a new phase of one of the most ambitious projects aimed at improving the Old Town Cehegin.
According to Soria, "is now completed more than 50 percent of the final draft of this round," one day come to the Holy Bridge.
The new road is equipped with a pedestrian walk 256 meters in length, with wide sidewalks and a look toward the plain of the Rio Argos.
It has two lanes for traffic, parking, benches and bins.
Area has been landscaped with 29 mulberry trees and 29 oaks, and has given numerous lamps with indirect lighting system that reduces light pollution and allows us to envision the west side of Old Town was declared a Historical Site in 1982.
According to José Ballesta, "is an action that allows the municipality to improve communications, enhance the values of the environment and revitalizing landmark historic and artistic heritage of the municipality."
Also announced that "we will study the new projects submitted to me this morning the mayor, such as the renovation of the Carretera de Murcia, from the rotunda of the spinner to the Cross, the arrangement of the road from Bridge St. to Circle Salt Water, and more aid for the settlement of facades in the Old Town. "
Source: Ayuntamiento de Cehegín