Cehegín Mayor Jose Soria, and council Works and Services and hamlets, Juan Antonio Chico and Joaquín Marín, respectively, accompanied by municipal officers, have visited the village of Canada de Canara, which just released the entire sewerage system , which has had an investment of 324,930 euros.
These studies, conducted by José Díaz SA company, have involved the installation of 880 linear meters of pipe network, 48 manholes and 56 house connections to all, to end with the asphalting full throughout the core.
Furthermore, it has acted in part of Cortijo Los Parry, who also debuts new sewer system.
Chico said that "these works involve the elimination of the problem of waste water discharges to gullies, ditches and potholes, thanks to the new sewerage network that connects to the general drainage of the coastal districts of Argos, which reach the sewage" .
"With the new sewer, paving and lighting, Canada de Canara has experienced in a very short time a major change, which makes it a modern hamlet, with a great quality of life for its neighbors", as stated by Councilman Works and Services.
Source: Ayuntamiento de Cehegín