"The town of Cehegin house a biomass plant 10 MW, which will help generate clean energy, and contribute to the good condition of the forest area", as declared by the Minister of the Presidency of the Region of Murcia, Manuel Campos, to the media after a meeting with the mayor of Cehegin, Jose Soria.
Ceheginero The mayor has told the company Biorefornor SL has already submitted documentation to the start of proceedings on the grounds of urban industrial area Water Board, which will raise the plant biomass, which will provide around 30 jobs fixed, and between 125 and 150 indirect jobs.
Campos, who has been very receptive to this project, explained that "Cehegín has approximately 15,000 hectares of forest, which can be determined to obtain an amount greater than the 150,000 kilos of raw materials, which could be used in that plant," trimmings from trees and agricultural crops, and traces of pruning and thinning of forests and energy crops.
The mayor wanted to value "the large number of hectares of forest that has Cehegín, its privileged geographical position in the Northwest Region, the solvency of the project and the need for jobs to be generated."
On the other hand, Jose Soria has asked the Minister of the Presidency of the gym equipment for the new Center for Integrated Public Safety, "which is all that has been pending in this building, from which all local police officers and volunteers of Protection Civil are very satisfied, "said he," as well as the possibility of financing a new vehicle for the local police. "
Source: Ayuntamiento de Cehegín